REHABILITATION OF INSTRUMENTATION AND CONTROL SYSTEM AT CAWTHORNE CHANNEL 2 FLOW STATION
The rehabilitation, overhaul and calibration of instrumentation and control (I&C) systems at the Cawthorne Channel 2 (CC2) Flow Station, OML 18, covering 17 reported deficiencies across 15 units and systems. The work is executed by Nondera Energy Services Ltd. for NEOL through a structured methodology that prioritizes HSE compliance, limits production impact and leaves each system tested and documented before handover.
The scope covers the Remote Shutdown Panel (RSP) and Pump-line trip loops, Close-drain and FLKO level switches, LP, HP and Test Separator controllers, Surge-Vessel Sunvic Moore switches and Back-pressure controller, Hunt valves, the Big Joe regulator, the Recirculating valve, ESD and Switch-loop tubing (1/4-inch and 3/8-inch stainless steel) and defective Pressure regulators.